Exclusive areas for Stainless Steel,
Aluminium fabrication

Clean room facility for exotic
material manufacturing
Welding Facility
- Certified for ISO 3834 - 2 & EN 1090 (In Progress)
- Codes & Standards : ASME Sec IX, AWS, EN
- Processes : GTAW, GMAW, SMAW, SAW, FCAW
Non-Destructive Examination (NDE/NDT)
- Liquid Penetrant Testing (PT)
- Magnetic Particle Testing (MT)
- Ultrasonic Testing (UT)
- Radiography Testing (RT)
Blasting & Painting
Facility
Major Machineries
CNC Vertical Turning Lathe
CNC Horizontal Boring Machine
CNC Vertical Machining Centre
CNC Vertical Machining Centre
CNC Vertical Turning Centre
Rotary Grinder
Hydrotest
Pneumatic Test
Helium Leak test
IP Testing
Rain test
Cable loop test
Earthing Continuity check
Flow Computer simulation check
Hydrotest
Pneumatic Test
Helium Leak test
IP Testing
Rain test
Cable loop test
Earthing Continuity check
Flow Computer simulation check
Other Facility
Can handle upto 200 MT as a single equipment
Can handle upto 200 MT as a single equipment
Max Transportation capability – 27m L x 6.5m W x 6.2m
Max Transportation capability – 27m L x 6.5m W x 6.2m
Max Transportation capability – 27m L x 6.5m W x 6.2m